Full-scope reinstatement contractor. Backfill, sub-base, tarmac, white works, and cold lay, delivered to NRSWA and local council standards. Family-run since 1980.

Reinstatement Works for
Utilities and Highways

Compliant to
NRSWA
+ local council standards
1980
Family-run since
NRSWA
Compliant standards
Grab lorry fleet
For backfill and muck-away
24/7
Standby crews
About This Service

What reinstatement works actually involves

McFadden Utilities is a reinstatement contractor based in Hertfordshire, delivering full-scope reinstatement works across utilities and highways in London and the South East. Typical clients include civils companies subcontracting reinstatement, utility contractors completing their own excavation works, main contractors on mixed-scope schemes, and developers on new-build projects that involve adopted highway reinstatement.

Reinstatement is the work of putting the ground back together properly after excavation. It covers everything from refilling the trench in compliant layers through to laying the final surface so the road, pavement, or hardstanding is as good as it was (or better). Done wrong, ground sinks, surfaces fail, and the client pays twice. Done right, it stays down for decades.

The McFadden reinstatement scope covers four broad buckets: backfill, sub-base preparation, tarmac, and white works. Backfill is the layered refill of the excavation. Sub-base is the compacted foundation under the surface. Tarmac covers hand-lay, machine-lay, patch repairs, overlays, coloured tarmacs, line painting, and anti-skid surfacing. White works covers kerbs, paving slabs, block paving, modular paving, concreting, and resin surfacing delivered through trusted third parties. Every job is reinstated to NRSWA specification and the local council’s own standards for the area.

Reinstatement is the bit people underestimate. It's not just tarmac over a hole. It's layers, compaction, the right material for the surface above, the right finish for the council spec. Get it wrong and you're digging it up again in a year.

Paul McFadden, Director

The backfill work uses a dedicated fleet of grab lorries for muck-away and aggregate delivery. Excavated material goes out, recycled aggregate comes in, and the trench gets filled in compacted layers to the depth specified. Compliance with the layering spec is what stops the surface sinking a year later.

Tarmac teams cover the full range: hand-lay crews for tight spots and patch work, machine-lay crews for larger areas and overlays, and specialist operatives trained in coloured tarmac, line painting, and anti-skid surfacing. One recent addition is a cold lay product now being accepted by more councils. Cold lay cures fast enough to reopen a road within hours rather than waiting for a hot tarmac cooling window, which matters on live highways. It’s typically used around ironworks and small patch repairs where road closure time is the pressure point.

White works covers the hard-landscaping side: kerbs, paving slabs, block paving, modular paving, and concreting. Resin surfacing is delivered through a trusted third-party partner where specified. Most white works go hand-in-hand with utility reinstatement on housing estate schemes, footpath improvements, and commercial development entrances.

Work runs from the Hertfordshire depot, covering London and the wider South East as standard. Larger schemes and term contracts take teams further afield.

What's included

  • Backfill in compliant layers
  • Grab lorry muck-away and aggregate supply
  • Sub-base preparation for roads
  • Hand-lay tarmac for patches and tight spots
  • Machine-lay tarmac for larger areas
  • Coloured tarmac and overlays
  • Line painting and anti-skid surfacing
  • Cold lay tarmac (councils approved)
  • Kerbs, slabs, block paving and concreting
  • NRSWA-compliant final surface
How We Work

From backfill
to final surface

Reinstatement work runs in four phases, from the moment the excavation is complete to the moment the finished surface is signed off. Each phase builds on the one before it, which is why compliance at every layer matters more than speed at any one step.

1

Backfill and compaction

Excavated material removed, clean aggregate delivered, and the trench refilled in layers to the specified depth and compaction. This phase decides whether the surface stays down or sinks a year later.

2

Sub-base preparation

The compacted foundation under the surface, built to the specification for the surface above. A kerb-edge footpath needs a different sub-base to a bus route, and both get what they need.

3

Surface works

Tarmac, block paving, slabbing, concreting, kerbs, resin surfacing, coloured tarmac, or cold lay (whatever the surface specification calls for). Hand-lay or machine-lay crews depending on the scope.

4

Finishing and sign-off

Line painting, anti-skid surfacing where specified, final inspection to NRSWA and local council standards, and handover. Photos and sign-off sheets for the client's records.

Trusted by
Affinity Water
Balfour Beatty
Skanska
Thames Water
Murphy Group
PodTrak
Morrisons
IWS
Our Work

Recent reinstatement work

Three recent projects where reinstatement was a significant part of the scope. Every burst main repair, mains installation, or line stopping job ends with the ground being put back together. These are the reinstatement stories behind the headline work.

View all projects →
Where We Work

Reinstatement works across the South East

Reinstatement teams work from the Hertfordshire depot, covering London and the wider South East as standard. The six-county core service area is where the majority of work gets delivered, with larger schemes and term contracts taking teams further afield.

Hertfordshire London Surrey Essex Cambridgeshire Berkshire

Reinstatement FAQs

The questions we hear most about reinstatement works.

Reinstatement works are the job of putting the ground back together properly after an excavation. After a utility company digs a trench to repair a main, or a contractor excavates to install new ducting, or a developer opens up a road to make a connection, someone has to refill the hole and put the surface back. That’s reinstatement. Done to NRSWA and local council standards, it covers backfill, sub-base preparation, and the final surface (tarmac, block paving, concrete, kerbs, or whatever the specification calls for).

NRSWA is the New Roads and Street Works Act, which sets the national specification for how excavations in public highways must be reinstated. A compliant reinstatement uses the right materials in the right layers to the right depth, with the right compaction, topped with a surface course that matches what was there originally. Compliance is what stops the road sinking, stops the surface cracking, and stops the utility company being called back to redo the work. Every McFadden reinstatement is delivered to NRSWA specification or the local council’s own standard where that’s stricter.

The McFadden reinstatement scope covers four buckets. Backfill is the layered refill of the excavation, using recycled aggregate delivered by the in-house grab lorry fleet. Sub-base is the compacted foundation under the surface. Tarmac covers hand-lay, machine-lay, patch repairs, overlays, coloured tarmacs, line painting, anti-skid surfacing, and cold lay. White works covers kerbs, paving slabs, block paving, modular paving, concreting, and resin surfacing (through a trusted partner). Every scope runs to the specification for that particular surface and location.

Cold lay is a tarmac product that cures at ambient temperature instead of needing to be laid hot from a tarmac truck. It’s used where road closure time is the pressure point, because the road can be reopened to traffic within hours rather than waiting for a hot tarmac cooling window. Typical use cases are around ironworks, small patch repairs, and emergency reinstatement on live highways. More councils are approving cold lay as the products improve. McFadden’s teams are trained and ready to use it where the specification allows.

Yes. A significant portion of McFadden’s reinstatement work comes through civils firms, utility contractors, and main contractors who need a specialist reinstatement team on a scheme they’re delivering end-to-end. The NRSWA and council standards are the same regardless of who holds the lead contract. Subcontract reinstatement enquiries welcome.

Yes. McFadden handle both ends of the spectrum. Small patch repairs are hand-lay work, often following a single burst main or small excavation. Larger schemes are machine-lay work, covering big footprints on new-build estates, term maintenance contracts, or extensive highway reinstatement. Some jobs combine both on the same site. The right crew and plant for the scope get assigned to each job.

McFadden deliver reinstatement works across Hertfordshire, London, Surrey, Essex, Cambridgeshire, and Berkshire as standard, working from the Hertfordshire depot. Larger schemes and term contracts take teams further afield. Get in touch for projects outside this core area.

Reinstatement is the post-excavation context: a hole was opened up for utility or highway work, and the reinstatement job is to put it back together. Standalone tarmac work is new surfacing not tied to an excavation, like surfacing a new car park, overlaying an existing driveway, or resurfacing a road for condition reasons. McFadden do both – if the work you need is standalone commercial surfacing rather than post-excavation reinstatement, the tarmac and road surfacing service is the right starting point.

Get In Touch

Ready to discuss
your reinstatement project?

Whether it's a single trench reinstatement, a full highway restoration, or a mixed-scope scheme with backfill, tarmac, and white works across multiple phases, the reinstatement team are happy to talk through the scope and get a quote over. Subcontract enquiries from civils firms, utility contractors, and main contractors welcome.

Request a quote