Real work, for real clients. From emergency trunk main repairs to multi-phase self-lay schemes, here’s a look at what we deliver.
Repair & maintenanceInstall line stop to aid with construction works carried out by Ian and team.
Read case study →
Repair & maintenancePRV and meter install at Brunswick Park with under pressure drilling.
Read case study →
Repair & maintenanceUnder pressure drillings at Blackford Pumping Station. Works completed by Lucas and Kris.
Read case study →
Repair & maintenance14" encapsulation collar installed to save shutting the main and minimising disruption to the network.
Read case study →
Repair & maintenanceVery severe 12” burst main under concrete silos within cement works. 70 metres of 250mm main slip lined up the damaged 12” main, pressure tested and chlorinated. Works completed within 4 days with minimal customer impact.
Read case study →
Repair & maintenanceLeaks on dual 9” mains on the bridge crossing the M4. Both mains slip lined with 180mm PE, pressure tested and chlorinated and put back into service within one week.
Read case study →
Repair & maintenanceLine stop required so we could carry out some maintenance on the network and install 2 valves and a hydrant.
Read case study →Whether it's a complex repair, a self-lay scheme, or a reinstatement programme. One call, honest advice, clear price.
Phone: 01707 648 420
Email: info@tonymcfadden.co.uk