Real work delivered for water companies, developers, and Tier 1 contractors in the Repair & maintenance category.
Repair & maintenance350mm repair completed on a GRP water main in Walton. Overgrowth cleared and concrete-encased main excavated before the damaged section was cut out and replaced with a new PE pipe section using flanged mechanical couplings.
Read case study →
Repair & maintenanceProject overviewCross connection between a 3 inch and 6 inch water main on Park Road, Hayes, for Affinity Water network reinforcement. Delivered live by Ian and DJ, with the works used as the site audit for their EUSR NCO (Water) Network Construction Operations registration. Audit carried out by Jo Parker.
Read case study →
Repair & maintenanceCross connection install on an Affinity Water network in Ascot, Berkshire. Under-pressure drilling and pipework fabrication to tie two sections of distribution main together, completed live without service interruption. Delivered by Lukos and Kris.
Read case study →
Repair & maintenanceComplete pressure management installation for Affinity Water. Live main exposed, under-pressure drilled, line stopped for isolation, bypass pipework installed, pressure reducing valve (PRV) commissioned, and full site reinstatement. No service interruption throughout. Completed by Mark and Ciaran.
Read case study →
Repair & maintenanceTwo under-pressure drillings on a 9 inch water main in Watford for Affinity Water, installing two washout points in the footway to enable future network flushing operations without road works. Carried out live - no customer impact. Completed by Lukos and Kris.
Read case study →
Repair & maintenanceEmergency 12 inch burst main repair on Lower High Street, Watford. Rick and Anthony worked through Friday night into Sunday to complete the repair, backfill, reinstate, and fully reopen the road by midday Sunday.
Read case study →
Repair & maintenance1200mm cut out at Chertsey works. Challenging job carried out by Chris, Tyler, Dan and Michael.
Read case study →
Repair & maintenance30" burst main
Read case study →
Repair & maintenanceLeak on 1200mm GRP Water Main within treatment site
Read case study →Whether you're a developer planning a self-lay scheme, a water company responding to a burst, or a Tier 1 contractor looking for utility subcontracting capacity, we'd welcome the conversation.