Articles and guides from the McFadden team tagged surfacing.
Can you lay tarmac in the rain? Usually, yes. Why standing water, not rain, stops a surfacing job, who makes the call and what to ask first.
Tarmac and asphalt are the same material in the UK today. Where the names come from, the asphalt types you'll be quoted for, and what to ask for.
How long does tarmac take to dry? Hot lay is ready when it's cool, not after a set number of days, and cold applied sets on its own schedule. What the UK standards say.
Whether you're a developer planning a self-lay scheme, a water company responding to a burst, or a Tier 1 contractor looking for utility subcontracting capacity, we'd welcome the conversation.
Phone: 01707 648 420
Email: [email protected]